UNCLASSIFIED
UNCLASSIFIED
Final-T Number Constraints
•Initial Classification must be 1.0 or 1.5 (period).
•During the first 48 hours of development Final-T can not be lowered at night (but you can during day-light).
•24 hours after initial 1.0, Final-T must be < 2.5.
•Final-T limits:
•< 3.5 =FT can change only 0.5 per 6 hours.
•> 4.0 = FT can change only1.0 per 6 hours, 1.5 per 12 hours, 2.0 per 18 hours, or 2.5 per 24 hours.
•Final-T must be + 1.0 from MET.