| 1. Make the CI the same
as Final-T during development, but hold higher during weakening.
2. Do not lower CI until
at least 12 hours have past.
|
3. 3. CI will not be more that 1.0 greater than Final-T (CI can be either 0.5 or 1.0 higher than FT). |
|
Go to Step 10 |
||
|
|
|
| Paul
McCrone, Chief Forecaster
HQ Air Force Weather Agency (AFWA) Meteorological Satellite Applications Office Code: XOGM 106 Peacekeeper Dr. STE 2N3 Offutt AFB, NE 68113-4039 |
Email:Paul.McCrone@afwa.af.mil
andPaulJMC@aol.com WWW: http://zephyr.unl.edu/~pmccrone http://members.aol.com/PaulJMC/html |
Phones:
COMM: (402) 294-2821 DSN: 271-2821 Fax: (402) 294-5872 |
Many thanks to the University of Nebraska for hosting this page!